Puroxi industry centre

Cooling Tower Water Centre

Cooling-water performance depends on microbiological control, clean heat-transfer surfaces, stable chemistry, filtration, blowdown and a complete Legionella water-management programme.

Understanding the application

Water Conditions Affect the Complete Operation

Puroxi does not begin with a product. We begin by understanding where the water comes from, how it moves through the site, what it contacts, what has already been tried and what the operation needs the water to do.

01

Legionella and other microbiological risk

This condition is evaluated in relation to the source water, system design, operating load and the required outcome.

02

Scale, corrosion and heat-transfer loss

This condition is evaluated in relation to the source water, system design, operating load and the required outcome.

03

Biofilm, sediment and basin algae

This condition is evaluated in relation to the source water, system design, operating load and the required outcome.

04

High makeup, blowdown and chemical demand

This condition is evaluated in relation to the source water, system design, operating load and the required outcome.

Systems and applications

See How the Treatment Tools Fit the Water

These photographs show genuine Puroxi equipment or approved application references. Final equipment selection and layout remain site-specific.

Cooling-tower basin purification
Puroxi circulation, filtration and treatment return water to the cooling-tower basin
Cooling-water treatment loop
Monitoring and side-stream treatment are arranged around makeup water and operating cycles
Scale-condition comparison
Documented surface condition supports responsible treatment verification

How Puroxi approaches the water

A Site-Specific Treatment Pathway

01

Coordinate every change with the formal Legionella programme

Treatment selection follows water testing, hydraulic review, material compatibility and the customer’s verification requirements.

02

Use filtration, scale control and compatible treatment barriers

Treatment selection follows water testing, hydraulic review, material compatibility and the customer’s verification requirements.

03

Improve basin circulation or side-stream gas transfer where suitable

Treatment selection follows water testing, hydraulic review, material compatibility and the customer’s verification requirements.

04

Monitor cooling and water performance together

Treatment selection follows water testing, hydraulic review, material compatibility and the customer’s verification requirements.

Information required

What Puroxi Needs Before Recommending Equipment

Good design depends on accurate site information. Reports, photographs, drawings and operating history help prevent assumptions.

  1. Makeup water, tower design and heat load
  2. Cycles, conductivity and chemical programme
  3. Basin geometry, filtration and blowdown
  4. Microbiology, deposits and cleaning history
Water testing

Relevant parameters may include temperature, pH, dissolved oxygen, salinity, conductivity, turbidity, hardness, alkalinity, nutrients, organics, metals, microbial information and algae identification, together with the process-specific information required for this industry.

Monitoring and verification

Measure the Water and the Operating Result

01

Required microbiological testing

Record the baseline, treatment settings, operating changes and follow-up results so performance can be evaluated responsibly.

02

Approach temperature and heat-transfer performance

Record the baseline, treatment settings, operating changes and follow-up results so performance can be evaluated responsibly.

03

Scale, corrosion and deposit condition

Record the baseline, treatment settings, operating changes and follow-up results so performance can be evaluated responsibly.

04

Makeup, blowdown, conductivity and energy

Record the baseline, treatment settings, operating changes and follow-up results so performance can be evaluated responsibly.

The Puroxi process

Test. Design. Treat. Verify.

  1. Characterize the source and the operating problem.
  2. Define the objective, limitations and applicable requirements.
  3. Design the hydraulic, gas, treatment and monitoring arrangement.
  4. Commission, document, evaluate and refine the programme.

Let’s Understand Your Water.

Share water tests, photographs, flows, volumes, drawings, existing equipment and the result you need to achieve.

Start Technical Review →