Puroxi industry centre

Swine & Hog-Barn Water

Swine water programmes must account for the source, storage, medication equipment, nipple flow, animal stage and the full barn distribution system.

Understanding the application

Water Conditions Affect the Complete Operation

Puroxi does not begin with a product. We begin by understanding where the water comes from, how it moves through the site, what it contacts, what has already been tried and what the operation needs the water to do.

01

Well or municipal source testing

This condition is evaluated in relation to the source water, system design, operating load and the required outcome.

02

Storage and line hygiene

This condition is evaluated in relation to the source water, system design, operating load and the required outcome.

03

Nipple flow at peak demand

This condition is evaluated in relation to the source water, system design, operating load and the required outcome.

04

Iron, sulphur, sediment and biofilm

This condition is evaluated in relation to the source water, system design, operating load and the required outcome.

05

Medication and dosing compatibility

This condition is evaluated in relation to the source water, system design, operating load and the required outcome.

06

Water use and operating records

This condition is evaluated in relation to the source water, system design, operating load and the required outcome.

How Puroxi approaches the water

A Site-Specific Treatment Pathway

01

Water testing and technical review

Treatment selection follows water testing, hydraulic review, material compatibility and the customer’s verification requirements.

02

Treatment selected around the complete system

Treatment selection follows water testing, hydraulic review, material compatibility and the customer’s verification requirements.

03

Compatible equipment and operating controls

Treatment selection follows water testing, hydraulic review, material compatibility and the customer’s verification requirements.

04

Performance verification and refinement

Treatment selection follows water testing, hydraulic review, material compatibility and the customer’s verification requirements.

Information required

What Puroxi Needs Before Recommending Equipment

Good design depends on accurate site information. Reports, photographs, drawings and operating history help prevent assumptions.

  1. Current water report
  2. Flow, volume, pressure and temperature
  3. Drawings, photographs and existing equipment
  4. Problem history and treatment objective
Water testing

Relevant parameters may include temperature, pH, dissolved oxygen, salinity, conductivity, turbidity, hardness, alkalinity, nutrients, organics, metals, microbial information and algae identification, together with the process-specific information required for this industry.

Monitoring and verification

Measure the Water and the Operating Result

01

Baseline and follow-up water data

Record the baseline, treatment settings, operating changes and follow-up results so performance can be evaluated responsibly.

02

Equipment operating conditions

Record the baseline, treatment settings, operating changes and follow-up results so performance can be evaluated responsibly.

03

Site-specific performance indicators

Record the baseline, treatment settings, operating changes and follow-up results so performance can be evaluated responsibly.

04

Maintenance and operating records

Record the baseline, treatment settings, operating changes and follow-up results so performance can be evaluated responsibly.

The Puroxi process

Test. Design. Treat. Verify.

  1. Characterize the source and the operating problem.
  2. Define the objective, limitations and applicable requirements.
  3. Design the hydraulic, gas, treatment and monitoring arrangement.
  4. Commission, document, evaluate and refine the programme.

Let’s Understand Your Water.

Share water tests, photographs, flows, volumes, drawings, existing equipment and the result you need to achieve.

Start Technical Review →